Building Retrofit FAQ: Everything Owners Ask Before Getting Started

Writer: Wesley Mann
Wesley Mann
Sep 2
2 min read
Frequently asked questions about building retrofits and energy incentives in Ontario

Building Retrofit FAQ


Building owners considering a retrofit tend to ask the same handful of questions before committing to a project. This building retrofit FAQ pulls together the most common ones, answered plainly.


How do I apply for an incentive?

Mann Engineering completes the required documentation — such as the Technical Input Sheet — using information collected during the site assessment, including existing equipment data, sequences of operation and proposed retrofit details. This technical information then supports the incentive calculation and the application submission, so building owners don't need to manage the incentive application process themselves.


How do I get started with a building retrofit?

Call or email Mann Engineering to schedule a free assessment. The team will request basic building, utility and equipment information, then determine whether a site visit or remote screening is the best first step — a straightforward entry point into the building retrofit process.


Is there a cost to participate?

There is no cost for the preliminary assessment. If the owner chooses to proceed, detailed audit, engineering design, incentive application, tendering or implementation services may require a separate proposal — but the first step of any building retrofit is free.


Who decides what upgrades I can install?

The owner does. Mann identifies and explains potential measures, expected benefits, constraints and next steps, and the owner decides which measures should proceed — the building retrofit process is advisory, not prescriptive.


Can I use my own contractor to install the equipment?

Yes. Mann can support engineering and tendering, or a design-build delivery model. Owners may use their own contractor, subject to the project scope, technical requirements and any incentive-program conditions that apply to that particular building retrofit.


What happens to my old equipment?

The project scope defines whether existing equipment is removed, recycled, retained as standby, or replaced in phases as part of the building retrofit. Disposal and environmental requirements are coordinated with the installing contractor.


Who do I contact if I have concerns or issues?

Contact Mann Engineering directly. The team can respond directly or coordinate with the appropriate engineering, incentive, contractor or commissioning contact for your building retrofit project.


Still Have Questions About Your Building Retrofit?

If your question isn't covered in this building retrofit FAQ, the fastest way to get a straight answer is a free building retrofit assessment. Contact Mann Engineering to schedule yours and get building-specific answers instead of general ones.